.

Sunday, May 26, 2019

Classical Argument

Tiffany E. Duncan Shannon Collins Eng 101 September 23, 2012 Classical Argument Remodeling a house on wizards get isnt as cheap or as easy as it may seem, because more problems are often revealed during the demolition lay bug out of remodeling. One cant continuously prepare in advance for unforeseen problems when remodeling and it isnt always cheaper doing them on bingles own quite than hiring a headmaster. I was able to prove this to myself when I was remodeling my own house.The original plan was to have exclusively the remodeling completed within a year my clock time spent on the project is now over double what I expected and Im totally to the highest degree three fourths of the way complete. I had 6 projects that I wanted to do, keep in mind I live in an old farm house that was abandoned for 4 historic period before I began. I intend on refinishing all of the cabinets throughout the house, installing all untried windows, a complete bathroom remodel, new floors in the entire house, new ceilings in three rooms, and painting the entire house.I couldnt remodel my house full time when it wasnt livable being Im a single mother of two. That made it even harder but I also had less time to work than I planned because I also started attending college about one month into the renovation. When I started I expected to spend right around $5,000. 00. This was roughly the cost of all materials with about $1,000. 00 additional for anything that came up unexpected. For the most part I have done all the renovations myself with some help from family and friends Ive had to call in a professional one time. My running total is around $10,000. 0, which is double of what I planned on spending and its still going up The first project I began was refinishing the cabinets. This was quite a task I likewisek all the cabinet facings and doors off, sanded them as well as the cabinets and painted them. All the cabinets in my kitchen, 16 of them, took me approximately 5 mont hs to complete. Luckily my Dad was his own handy man so his tools and skills of the trade came in handy often An unforeseen task came when I started makeing the ceilings in the bathroom, my bedroom, and the hall way. I learned the house wasnt exactly built square.Just to be able to do my ceiling the correct way I had to add two inches to the ceiling rafters on about half the room. Not expecting this, I over spent $80 on this project. This was a small extend but every little thing you dont expect adds up quickly. The entire ceiling project ended up costing me an extra $600 over my estimate. With the house not being square, dry seawall was wasted and it was harder to apply the mud tape (which led me to buy a more expensive tape). What should have interpreted approximately two calendar weeks to complete took a total of two and a half months.For the bathroom remodel I al disseminateted myself $600. 00 to spend which is on the set down side for a complete bathroom overhaul. But I rea lly did my research on this one a new toilet was $300 and a new bathtub $200. I was able to get cabinets from my mom when she was redoing her kitchen and I used those in the bathroom which surprisingly saved me about $600. 00 if I bought them new. I just had to refinish them and paint them, and that little project still isnt complete. When I tried to take the bathtub out, I removed seal and unhooked all the plumbing but it wouldnt budge.I called a few of my family members to help remove it since it was a porcelain tub which is quite heavy. It still wouldnt come out, the fit was too tight. We used a little intuition and decided to just cut the bathtub out. Once it was cut in half it did give us copious room to get it out. However, putting the new tub in became and even harder task. We tried every way possible to put it in, but there wasnt enough room. It was even the same size as the old tub. When we measured the dimensions it was out of square by almost three inches.So we had to te ar down the wall at the end of where the bathtub would go, install the tub, and rebuild the wall. Supplies were costly for this bringing my expenses up $150 more than I planned and it added almost a weeks value of work. The toilet was supposed to be an easy job uninstall the old one, add a new seal and install the new one. Once the old one was taken off, we discovered it had been leaking on the floor ruining approximately a 4x5 section. We had to rip the old floor out, install new floor rafters and new floor.This added $200 more to my quickly rising total, for my new toilet and about two extra weeks of work since I couldnt begin doing the flooring myself. direct I was 10 months into the project and more than pay off to move since I was living with my mother while I was completing the renovation. I decided to redo the floors and paint next I could redo windows after I moved in. I pulled the old flooring up first this took 3 weeks and should have only taken a couple of days. Appare ntly the previous owners had pets and they used the restroom on the spread overs numerous times.So instead of being able to just pull the carpet up, I had to scrape it up. This didnt add on to my expenses since I was doing it myself, it just took a lot of patience because it took so long to do. Once it was all up, I had the floors inspected. To my surprise a support beam had given out under the front of the house. I had to call in reinforcements my dad and brother were both bulky handymen for the project. They had to use three jacks and actually jack the house up while they cut out the floor over the broken beam, took the beam out and put a new beam in.This added about $700 onto my estimates but only an extra day worth of work. With the carpet up and the beam fixed, I was ready to paint. It took me 3 months to get everything painted. I ended up having to buy Kilz to cover up stains, trimming to replace what was already missing or broken, and a lot of paint supplies. It took me thr ee months to paint the whole house, and I ended up about $500 over budget on supplies then I anticipated. I was going to do my floors myself, but it wouldnt have saved me any money once I purchased the trimming and the tools needed to install the carpet.Plus I was so exhausted from working on everything else I opted to hire in professionals to install my carpet. I did have to get on a list for installation, adding a week of just waiting to my time. It was worth it once the floors were in, it looked great and I was finally getting my energy back. Remodeling a house on ones own isnt as cheap or as easy as it may seem. It took me 14 months until I was able to move in my house. I had planned on being finished within 12 months and my work was only half done. Not to mention I was already over $2500 being preceding(a) my estimates on the house.It took a lot to be able to do the renovations myself, running into problems every time I turned around. I had to hire in professionals once but I probably should have a few more times. I tried to stay as close to my budget as possible. legion(predicate) of the factors that rose my spending were because more problems were revealed during the demolition stage of remodeling. One cant always prepare in advance for unforeseen problems when remodeling and it isnt always cheaper doing them on ones own rather than hiring a professional.

No comments:

Post a Comment